Reduction of Machine Setup Time for Manufacturing Sandwich Panel
item.page.dc.date.issued
2026-01-01
item.page.dc.type
item.page.dc.identifier.issn
21954356
item.page.dc.identifier.eissn
21954364
item.page.dc.identifier.doi
item.page.dc.identifier.scopus
2-s2.0-105046346204
item.page.oaire.citation.title
Lecture Notes in Mechanical Engineering
item.page.oaire.citation.volume
75
item.page.oaire.citation.startPage
691
item.page.oaire.citation.endPage
701
item.page.dc.rights.holder
SCOPUS
item.page.dc.identifier.citation
Lecture Notes in Mechanical Engineering Vol.75 (2026) , 691-701
punsarn.item.page.citation
Sukchai C., Vanichchinchai A., Sumrit D. Reduction of Machine Setup Time for Manufacturing Sandwich Panel. Lecture Notes in Mechanical Engineering Vol.75 (2026) , 691-701. 701. doi:10.1007/978-981-95-4717-3_62 Retrieved from: https://repository.li.mahidol.ac.th/handle/123456789/118752
item.page.dc.title
Reduction of Machine Setup Time for Manufacturing Sandwich Panel
item.page.dc.contributor.author
item.page.oairecerif.author.affiliation
item.page.dc.contributor.correspondence
item.page.dc.contributor.other
item.page.dc.description.abstract
This action research aims to reduce setup time of a sandwich panel manufacturing machine. Critical path method (CPM), single minute exchange of die (SMED) and Kaizen were applied for improvement. It was found that machine setup time was reduced from 1 h and 39 min to 53 min (47.14% decrease).
