Publication:
An Analysis of Cost Improvement Schemes for Electromagnetic Safety-Related Activities During Railway Project Implementation

dc.contributor.authorSaridroje Chanpermpoonpolen_US
dc.contributor.authorPhumin Kirawanichen_US
dc.contributor.otherMahidol Universityen_US
dc.date.accessioned2022-08-04T08:17:23Z
dc.date.available2022-08-04T08:17:23Z
dc.date.issued2021-01-01en_US
dc.description.abstractIn railway system construction, maintaining a reasonable cost of the system implementation has always been difficult without a well-defined strategy. This article describes the application of a switching algorithm to accommodate a reduction in cost drivers when performing a preinstallation electromagnetic compatibility measurement to identify interference from external environments along the railway alignment. The verification was exercised using measurement evidence through activity-based costing (ABC) analysis more accurately to reflect the budget against the traditional volume-based costing (VBC) method. The results were demonstrated through the total costs following the ABC and VBC breakdowns of the practical data, as well as the optimum number of test volumes for the opportunity of gaining high profit margins through the break-even analysis. By implementing the switch unit, an additional decrease in operation costs is achievable. The maximum total reduction is recorded at 28.55%, thus providing credibility to the proposed scheme. The outcomes can provide railway industries with financial benefits and are a useful reference for cost-effective on-site activities in dealing with safety impacts from external electromagnetic environments.en_US
dc.identifier.citationIEEE Transactions on Engineering Management. (2021)en_US
dc.identifier.doi10.1109/TEM.2021.3072919en_US
dc.identifier.issn15580040en_US
dc.identifier.issn00189391en_US
dc.identifier.other2-s2.0-85105866581en_US
dc.identifier.urihttps://repository.li.mahidol.ac.th/handle/123456789/76474
dc.rightsMahidol Universityen_US
dc.rights.holderSCOPUSen_US
dc.source.urihttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85105866581&origin=inwarden_US
dc.subjectBusiness, Management and Accountingen_US
dc.subjectEngineeringen_US
dc.titleAn Analysis of Cost Improvement Schemes for Electromagnetic Safety-Related Activities During Railway Project Implementationen_US
dc.typeArticleen_US
dspace.entity.typePublication
mu.datasource.scopushttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85105866581&origin=inwarden_US

Files

Collections