Setup Time Reduction: A Case Study of a Wire Coating Extruder Machine

dc.contributor.authorWisetwoharn P.
dc.contributor.authorVanichchinchai A.
dc.contributor.authorSumrit D.
dc.contributor.authorKitcho S.
dc.contributor.correspondenceWisetwoharn P.
dc.contributor.otherMahidol University
dc.date.accessioned2025-06-14T18:14:59Z
dc.date.available2025-06-14T18:14:59Z
dc.date.issued2025-01-01
dc.description.abstractThis action research aims to reduce the setup time of a wire coating extruder machine. The case company performed about 6 setups per day, with an average setup time of 58.67 minutes per setup, resulting in a total setup time of approximately 352.02 minutes per day. The Single Minute Exchange of Dies (SMED) technique, based on the principles of Shigeo Shingo, was applied. The machine setup was divided into 7 stages to suit the needs of the case study company. After the improvements, the setup time was reduced to 31.97 minutes per setup, resulting in a 45.51% increase in machine operation efficiency. The tools and techniques used in this research can be applied to similar machines for continuous improvement.
dc.identifier.citationKey Engineering Materials Vol.1012 (2025) , 101-105
dc.identifier.doi10.4028/p-MWwj48
dc.identifier.eissn16629795
dc.identifier.issn10139826
dc.identifier.scopus2-s2.0-105007514876
dc.identifier.urihttps://repository.li.mahidol.ac.th/handle/123456789/110709
dc.rights.holderSCOPUS
dc.subjectMaterials Science
dc.subjectEngineering
dc.titleSetup Time Reduction: A Case Study of a Wire Coating Extruder Machine
dc.typeConference Paper
mu.datasource.scopushttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=105007514876&origin=inward
oaire.citation.endPage105
oaire.citation.startPage101
oaire.citation.titleKey Engineering Materials
oaire.citation.volume1012
oairecerif.author.affiliationMahidol University
oairecerif.author.affiliationNaresuan University

Files

Collections