DETERMINING THE CAPACITY OF A MAJOR HIGHWAY SEGMENT USING AN EMPIRICAL METHOD

dc.contributor.authorKorbuakaew K.
dc.contributor.authorPhatchanakit T.
dc.contributor.authorLuangon C.
dc.contributor.authorSoe T.N.
dc.contributor.authorPathomsiri S.
dc.contributor.authorSrisurin P.
dc.contributor.correspondenceKorbuakaew K.
dc.contributor.otherMahidol University
dc.date.accessioned2026-01-13T18:13:55Z
dc.date.available2026-01-13T18:13:55Z
dc.date.issued2025-01-01
dc.description.abstractThis study estimates the highway capacity of a segment on Borommaratchachonnani Road, an eight-lane highway in Thailand, using an empirical model based on speed– flow relationships derived from field data. Traffic flow and speed data were collected via video recordings on multiple weekdays in February 2025. A speed–flow diagram was constructed using five-minute interval data to determine the empirical capacity of the highway segment. The resulting capacity estimate was compared with two established models: the Highway Capacity Manual (HCM) 2016 and the model developed by Thailand’s Department of Highways (DOH). Results indicate that both models significantly overestimate actual capacity by 72.76% for the HCM 2016 model and 30.73% for the DOH model. The overestimation in the HCM model is attributed to differences in driver behavior and the exclusion of motorcycles, while the DOH model, though more accurate, is outdated. The findings underscore the need for localized adjustments in capacity models to reflect Thailand’s unique traffic conditions. Key variables such as motorcycle prevalence, autonomous vehicles, access point density, and terrain type should be integrated into future modeling efforts.
dc.identifier.citationProceedings of International Structural Engineering and Construction Vol.12 No.1 (2025)
dc.identifier.doi10.14455/ISEC.2025.12(1).INF-03
dc.identifier.eissn2644108X
dc.identifier.scopus2-s2.0-105026771863
dc.identifier.urihttps://repository.li.mahidol.ac.th/handle/123456789/114014
dc.rights.holderSCOPUS
dc.subjectEngineering
dc.titleDETERMINING THE CAPACITY OF A MAJOR HIGHWAY SEGMENT USING AN EMPIRICAL METHOD
dc.typeConference Paper
mu.datasource.scopushttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=105026771863&origin=inward
oaire.citation.issue1
oaire.citation.titleProceedings of International Structural Engineering and Construction
oaire.citation.volume12
oairecerif.author.affiliationMahidol University

Files

Collections