Cost overrun and risk management of bridge construction in delta area and tidal zone in Myanmar
1
2
Issued Date
2021
Copyright Date
2021
Resource Type
Language
eng
File Type
application/pdf
No. of Pages/File Size
xii, 130 leaves : ill.
Access Rights
open access
Rights
ผลงานนี้เป็นลิขสิทธิ์ของมหาวิทยาลัยมหิดล ขอสงวนไว้สำหรับเพื่อการศึกษาเท่านั้น ต้องอ้างอิงแหล่งที่มา ห้ามดัดแปลงเนื้อหา และห้ามนำไปใช้เพื่อการค้า
Rights Holder(s)
Mahidol University
Bibliographic Citation
Thesis (M.Eng. (Civil engineering))--Mahidol University, 2021
Suggested Citation
Kyi, Yu Wai, 1981- Cost overrun and risk management of bridge construction in delta area and tidal zone in Myanmar. Thesis (M.Eng. (Civil engineering))--Mahidol University, 2021. Retrieved from: https://repository.li.mahidol.ac.th/handle/123456789/114121
Title
Cost overrun and risk management of bridge construction in delta area and tidal zone in Myanmar
Author(s)
Advisor(s)
Abstract
Nowadays, due to technological advanced world, every construction technique is becoming more and more complex with numerous risks. In Project management, crucial challenges for project performance in term of cost, quality, time and safety is undertaken by using risk analysis that pose the component of every bridge construction project. Cost overrun is one issue affecting the construction of bridge projects. To be successful, it needs effective cost overrun risk management concerning identification of risks, evaluating of risks and mitigating risks. The purpose of this thesis is to conduct cost overrun risk identification and evaluation combined system bridges. Several sets of questionnaires are used to collect data from experienced engineers in bridge construction project. The results of the survey revealed that the top ten cost overrun risks in bridge construction include Political complexities and economic instability, poor project management (inadequate project analysis), change construction method, lack of design team understanding of cost and value, work suspensions owing to conflicts, financial difficulties of owners/contractor, technical complexity of a project, shortage of technical/technicians’ personnel (skilled labor), poor site management and supervision and Lack of Warning Signboard. This paper only limits the combined system bridges (Steel Truss and reinforced concrete girder) in tidal zone and delta area in Myanmar. IMPLICATION OF THESIS: This research highlights the cost overrun risks of bridge construction especially combined system bridge in delta area and tidal zone in Myanmar. Brainstorming method, Bridge Construction Information Classification System (BCICS) with Work Breakdown Structure (WBS) were used to find new cost overrun risks. The results were suggested to reduce its likelihood or impacts the basis for making decisions in bridge construction projects. The study will discover a further detailed observation toward the better cost overrun mitigation plans although comprehensive lists of recommended actions were made based on bridge construction experts’ suggestions and experiences.